Riverside Housing – Internal Fire Precautions

Internal fire precaution upgrade works to 56 HMO apartment buildings (448 individual flats/ residents) which remained in full occupation throughout the project.
  • Commencement: April 2016
  • Client: Riverside Housing
  • Project Type: Fire Precaution Works
  • Value: £600,00

About this Project

Scope of works

  • Replacement of internal and external fire check and fire escape doors
  • Replacement of floor coverings
  • Loft space compartment protection
  • Heat, smoke and lighting system upgrading
  • Fire alarm upgrading
  • Staircase handrail upgrading
  • Concrete repairs to staircases
  • Fireproof upgrading to staircases
Benefits we brought to the project

  • 100% local employment
  • Complete Resident Liaison service including briefing and QA checking to handover.
  • Open book accounting
  • 24 hr fully manned callout service for residents and clients peace of mind and single point of contact for emergency issues
  • Continuous Site Management by the same staff ensuring complete continuity
  • Flexible and swift response from in house trade’s services for ‘bolt on’ works instructed at short notice ‘whilst on site’.
  • Complete coordination of multiple trades working on multiple blocks of property all controlled via our in-house RLO and Site Management teams under fully deployed programmed works schedule.
  • Self vetting and QA checking for sign off and handover under right first time protocols. This provided a 5% random inspection only by the clients CoW quality inspectors.

Related Projects

Home Group - New Build Development

Top Notch will deliver 66 homes positioned on the 4 acre site on the former CWS Dairy located directly off Hollywell Crescent, Durranhill, Carlisle. Top Notch will deliver in 3 phases, the new ‘turn key’ development, recently christened Millers Close, with final phase handover by the beginning of 2020.

Riverside Housing Association - Internal Fire Precaution Upgrades

Internal fire precaution upgrade works to 56 HMO apartment buildings (448 individual flats/ residents) which remained in full occupation throughout the project.

University of Cumbria - Campus Extension

Design and Build project for demolition of existing temporary link structure and provision of new laboratory facility including M&E and structural component replacement works to form teaching and training resource centre.

Contact Us

4a, Brunel Way, Duranhill, Harraby, Carlisle, Cumbria, CA1 3NQ

 

01228 524117

reception@topnotchcontractors.co.uk

 

Head Office