Riverside Housing – Internal Fire Precautions

Internal fire precaution upgrade works to 56 HMO apartment buildings (448 individual flats/ residents) which remained in full occupation throughout the project.
  • Commencement: April 2016
  • Client: Riverside Housing
  • Project Type: Fire Precaution Works
  • Value: £600,00

About this Project

Scope of works

  • Replacement of internal and external fire check and fire escape doors
  • Replacement of floor coverings
  • Loft space compartment protection
  • Heat, smoke and lighting system upgrading
  • Fire alarm upgrading
  • Staircase handrail upgrading
  • Concrete repairs to staircases
  • Fireproof upgrading to staircases
Benefits we brought to the project

  • 100% local employment
  • Complete Resident Liaison service including briefing and QA checking to handover.
  • Open book accounting
  • 24 hr fully manned callout service for residents and clients peace of mind and single point of contact for emergency issues
  • Continuous Site Management by the same staff ensuring complete continuity
  • Flexible and swift response from in house trade’s services for ‘bolt on’ works instructed at short notice ‘whilst on site’.
  • Complete coordination of multiple trades working on multiple blocks of property all controlled via our in-house RLO and Site Management teams under fully deployed programmed works schedule.
  • Self vetting and QA checking for sign off and handover under right first time protocols. This provided a 5% random inspection only by the clients CoW quality inspectors.

Related Projects

Home Group - New Build Development

Top Notch will deliver 66 homes positioned on the 4 acre site on the former CWS Dairy located directly off Hollywell Crescent, Durranhill, Carlisle. Top Notch will deliver in 3 phases, the new ‘turn key’ development, recently christened Millers Close, with final phase handover by the beginning of 2020.

Riverside Housing Association - Internal Fire Precaution Upgrades

Internal fire precaution upgrade works to 56 HMO apartment buildings (448 individual flats/ residents) which remained in full occupation throughout the project.

University of Cumbria - Campus Extension

Design and Build project for demolition of existing temporary link structure and provision of new laboratory facility including M&E and structural component replacement works to form teaching and training resource centre.

Contact Us

4a, Brunel Way, Duranhill, Harraby, Carlisle, Cumbria, CA1 3NQ

 

Hawkshead Sawmill, Hawkshead, Ambleside, Cumbria, LA22 0PL

01228 524117

reception@topnotchcontractors.co.uk

 

Head Office

Hawkshead Depot